Typical projects
- Production halls 100–750 kWp with self-consumption and peak shaving
- Logistics roofs with full feed-in at the higher tariff
- Multi-family buildings with tenant electricity models
- Car parks with solar canopies and charging points
What you get
A profitability calculation based on your 15-minute load data, a fixed-price offer, structural and fire-safety coordination, installation by our crew and the complete grid process – including the direct-marketing set-up above 100 kWp.

